Facilities and services
Whatever cargo you want to ship – containerized or conventional, bulk or break-bulk, frozen or liquid – we can handle it. We have the equipment, know-how and expertize to do it in the most efficient way.
Discover new possibilities with us!
Container Terminal
In 2023, the terminal handled a record 6.27 million tones of cargo, including 494 062 TEUs of containers.
In 2023, KCT consistently implemented its investment plan and invested around EUR 20 million in terminal expansion, infrastructure improvements and new handling equipment. In 2023, KCT received the most powerful Liebherr cranes in the Baltics, which can handle up to 300 tones of cargo at a time, as well as the renewal of the fleet of terminal tractors and the purchase of 4 new units of this equipment.
The terminals have a 500 kW solar power plant installed on the warehouse roofs. Thanks to this investment, the terminal is now also supplied with electricity from renewable sources.
Services
-
Handling all types of containers
-
Services to reefer units
-
Stripping and stuffing (CFS)
-
Storage and weighing, VGM
-
Container depot services
-
Electronic reporting, EDI
Capacity
Berths
143 / 143a
Address & coordinates
Perkelos 8, Klaipeda
55.642916, 21.157426
700 000 TEU per year
600 000 TEU per year
Intermodal possibilities
About 15% of all containers arrive and leave the terminal by railway. It is a convenient, safe and fast mode of transport to Belarus, Russia, Ukraine and Kazakhstan. A modern RTG crane is used for efficient railway operations.
Container trains
Berths
Cranes
Storage
Length: 820 m
Draft: 13.4 m
Max. ship length: 360 m
4 STS (2x40 t, 2x65 t)
2 mobile (154 t)
9 RTG (40 t)
Container yard: 26,000 TEU
Warehouses: 24,000 sq. m.
Premises
32 ha
4 railway tracks / 100 wagons
600 reefer plugs
Ro-Ro & General Cargo Terminal
In 2023, the terminal handled 776 000 t of cargo. The main cargoes consisted of bulk and packaged general cargo, such as timber, fertilisers, agricultural produce and oversized cargo such as coils or wind turbines.
In 2023, the TT-Line Ro-Ro terminal handled 318 ferries, an increase of 11.6% compared to 2022.
Services
-
Handling of ro-ro and general purpose vessels
-
Stevedoring of bulk and break-bulk cargo
-
Bagging bulk cargo and loading to containers
-
Packing, weighing, consolidation of shipments
-
Handling of OOG cargo and heavy loads
-
Storage and warehousing
Address & coordinates
Minijos 180, Klaipeda
55.656305, 21.162271
Berths
127 / 128
Capacity
1 500 000 mt per year
Berths
Length: 2 x 260 m
Draft:
-
Berth 127 - 9.8 m
-
Berth 128 - 13.4 m
Max. ship length: 230 m
Equipment
Crane GOTTWALD G HMK 5506 (125 t)
Crane LIEBHERR LHM 320 (104 t)
Wagon unloading transporters: 2
Hydraulic loaders: 6
Bulk packing equipment
Storage facilities
Storage yard: 20,000 sq. m.
Warehouses: 36,000 sq. m.
Let’s communicate
Send us a message
TT-Line ro-ro service
Join the team
Call us
© 1994 - 2018 JSC KLAIPEDOS KONTEINERIU TERMINALAS
© 2018 KLAIPEDOS TERMINAL GROUP All rights reserved
Minijos st. 180, LT-93269 Klaipeda, Lithuania
TT-Line ro-ro service
The line‘s ro-pax ferries provide transportation of vehicles and passengers between Klaipeda and Trelleborg (Sweden) and Karslhamn, also to Travemünde in Germany.
Currently the line offers seven departures per week from KCT Ro-Ro terminal (Minijos str. 180):
- 3 times a week to Trelerborg;
- 3 times a week to Karslhamn, Sweden;
- 1 weekly trip to Travemünde, Germany.
Address
Minijos 180, Klaipeda
Berths
127 / 128
Capacity